SharedPlan Home
Products
Buy

project plans

Share this plan...

Plan: BIAL Nuance Schedule

Plan ID: 1220 (Use this number to open the plan. Here's how.)

Whether or not you're a veteran project manager, SharedPlan provides you with powerful yet easy to use tools that support the success of your projects.
 » Mac Project Management Software
 » Windows Project Management Software
 » Online Web-based Project Management
 » Product tour video and screenshots.

Email this plan summary to a friend or colleague...

Plan notes: PORT BIAL

Plan Summary Report

Plan Top Level
NameDuration
02) Presentation of Final Scheme Designs: Duty Free & Cocoon (Zurich).2.0
19) Detailed Briefing of Grottini Shopfitter & Handover of Final Drawing Package.2.0
07) All Stores: Design Schemes Frozen.1.0
09) Final Technical Drawing Package Production commences. (Final Construction Issue).20.0
16) Final Checking of Drawing Package & Sign off Internally. (Portland).2.0
17) Final Approval of drawing package from Nuance.1.0
06) Presentation of Final Nuance Retail Design to BIAL. For feedback prior to freezing. (India)1.0
14) Nuance Retail Design Intergration with HVAC & Building Security (WINTERS). 3.0
08) Lighting Scheme Design. (RCPs to Siteco, for scheme design).13.0
04) Presentation of Final Scheme Designs: Shoppers Stop / Sound & Vision / Crossword / Life Spirit / BD Choc / La Moda. (Zurich).2.0
01) Fixturing & Scheme Development: Duty Free & Cocoon.5.0
11) HVAC Scheme Proposal Design & Calculations.5.0
12) HVAC: Briefing of Winter Engineering of Nuance Retail Scheme.1.0
15) Coordination of Nuance Retail Design with HMS Host F&B Consultants (Dreeson).1.0
13) Security Systems Scheme Proposal Design.9.0
03) Fixturing & Scheme Development: Shoppers Stop / Sound & Vision / Crossword / Life Spirit / BD Choc / La Moda.10.0
05) Update of changes to Nuance Retail Scheme7.0
10) Production Of Material Specification Doc.20.0
18) Final Construction Drawing package Issued to Nuance / BIAL / Grottini. 1.0
20) Detailed Breakdown Costing of Project By Grottini.7.0
21) Submittal of Project costs from Grottini to Nuance.1.0
22) Approval of Project Construction costs and Appointment of Grottini.5.0
23) Grottini: Production of Final Construction Drawings for Nuance Areas. (Note this will be phased by shop)20.0
24) Grottini: Production of Prototypes for final approval by Nuance.9.0
25) Grottini / Nuance: Approval of prototypes for production.1.0
30) Grottini onsite Installation of All Stores in PTB. BIAL30.0
28) Crating & Shipping of all shop Interiors to India. (Mumbai)22.0
29) Customs Clearence & Shipping of containers to Bangalore10.0
27) Nuance Inspection & Sign off of Final Freetanding Fixtures.5.0
31) Nuance Inspection & Snagging of All Stores.5.0
32) Grottini Completion of all snagging.8.0
26) Grottini: Full Production of all Stores35.0
33) Grottini HandoverAll completed stores to Nuance, For merchandising.1.0